Your trusted adviser for R&D Tax Credits, Creative Tax Relief, and R&D Grants

Early Access, DLC and Live-Service Games Under VGEC

Video Games Expenditure Credit rules for early access, DLC and live-service games: when post-release development qualifies and when it counts as maintenance.

Millie Palmer

Technical Analyst/Writer

Published on: 25/11/2026

6 minute read


Games don't stop being developed on launch day any more. Early access releases, seasonal content, expansion packs and rolling updates mean most studios are still writing code long after players have paid for the game.

That creates a genuine problem for your Video Games Expenditure Credit claim, because the scheme was drafted around a model where a game is designed, produced, tested and then finished. This post covers how the rules apply when your game doesn't work that way.

What counts as core expenditure after release?

Core expenditure is spending on designing, producing and testing your game. HMRC's manual is explicit that it excludes “initial concept design, debugging or post-release maintenance”.

Read quickly, that last phrase sounds like everything after launch is out. It isn't. The exclusion bites on maintenance, which means keeping a finished game running: server upkeep, platform compliance patches, crash fixes, compatibility work for new hardware.

New content is a different thing entirely. If you're designing, producing and testing something that didn't exist before, you're doing core development work, and the fact that players already own the base game doesn't change what the work is. The distinction HMRC is drawing isn't before launch versus after launch. It's development versus upkeep.

Does early access mean your game is complete?

Early access sits awkwardly with two separate tests.

The first is the supply condition: your game has to be intended for supply at the end of each accounting period. HMRC defines supply as “being made available for members of the general public to play”. An early access release satisfies that comfortably. If anything, you're in a stronger position than a studio still two years from launch, because the intention isn't hypothetical.

The second test is about completion. Your final statement of core expenditure goes in the return for the period in which the game is completed or abandoned, and HMRC doesn't define completion for video games anywhere in the manual. That leaves it as a question of fact.

Our view is that an early access build is not a completed game, and the development work taking it to 1.0 is core expenditure. But you need to be able to demonstrate that, which means your own documentation has to be consistent. If your roadmap, store page and internal milestones all describe the game as unfinished and in active development, you have a position you can defend in a compliance check. If early access was effectively your commercial launch and the subsequent work was polish and bug fixing, the picture is much less favourable.

When is DLC part of the same game, and when is it a new one?

Each game is a separate trade, and additional content either belongs to the original trade or starts a new one.

Content-only additions usually stay in the original trade. Where extra levels are released as an expansion pack and don't “fundamentally change the underlying game code or functionality”, the costs sit with the original game. HMRC says the key factor is whether there are improvements made to the underlying game engine.

Substantial development can create a new game. The manual accepts that an expansion pack could be a new game where the development work is significant enough, and the same facts-based approach applies to sequels.

The practical consequence is a certification one. If the new content sits in the original trade, it's covered by the existing BFI cultural certificate and goes into your existing cumulative claim. If it's a new game, it needs its own certificate and its own trade, with its own 10% UK expenditure test to satisfy.

A studio releases a story expansion for its RPG eighteen months after launch. It adds three new regions, a new questline and new voice acting, all built on the existing systems with no engine work. That's additional content within the original trade, claimed cumulatively alongside the base game under the existing certificate.

A second studio releases what it markets as an expansion, but the work involved rewriting the rendering pipeline, rebuilding the netcode for larger player counts and a new progression system. The engine changes are substantial enough that this is realistically a new game, needing its own BFI certification and its own trade.

Live-service games and the maintenance line

Live-service titles are the hardest case, because they're never complete in the ordinary sense and the development spend never stops.

In practice, you're drawing the development versus maintenance line repeatedly rather than once. Costs on a seasonal content drop with new maps, modes and systems look like development. Costs on balance patches, anti-cheat work, server scaling and bug fixes look like maintenance. The same programmer may do both in the same month, which is why apportionment matters as much here as it does across the original development phases.

HMRC's existing position on phases applies directly: the split has to be just and reasonable, and no particular method is mandated. Timesheets tied to specific content releases are by far the strongest evidence, because they let you connect a cost to a named piece of new content rather than to a period of time. Where you're estimating, be ready to explain the basis.

A live-service game also raises the completion question again, since the final statement of core expenditure has to land in some accounting period. If your game has no realistic end point, this is worth discussing with your adviser before you file, not afterwards.

Has HMRC confirmed any of this?

Not in the terms studios would like. The manual addresses expansion packs and the separate trade question, but it says nothing about early access, live-service models or the treatment of recurring content releases, and no worked examples cover them.

That gap is recognised in the industry. TIGA's Autumn Budget submission asked the government to confirm that post-release launch development costs can qualify, which tells you the uncertainty is real rather than something studios have invented. Ireland has already moved on this, extending its Digital Games Tax Credit to cover post-release content for up to three years after launch, so the UK is now the less certain of the two regimes on exactly this point. We've covered the wider reform debate in How Could the Video Games Expenditure Credit Be Improved?

Until HMRC says more, these claims turn on how well you've documented what the work actually was.

Key takeaways

  • Post-release doesn't mean ineligible. The exclusion is for maintenance, not for new development work that happens to be done after launch.
  • Early access satisfies the supply condition. Making your game available to the public is supply, so the harder question is whether the game is complete, not whether it's been supplied.
  • Content-only DLC usually stays in the original trade. Engine changes are the factor HMRC points to when deciding whether substantial new development has created a new game.
  • A new trade means new certification. Treating an expansion as a new game brings its own BFI certificate and its own 10% UK expenditure test with it.
  • Live-service claims rest on apportionment. Development and maintenance work happen side by side, so your evidence needs to connect costs to specific content releases.
  • The judgement calls are worth making early. Deciding how your post-release work is characterised while development is live is far easier than reconstructing it at filing, and it usually widens rather than narrows what you can claim.

If your studio is running an early access release, shipping regular content updates or weighing up whether an expansion should be its own trade, these are decisions worth getting right before you file. Myriad's team works specifically on creative sector tax credits and can review how your post-release development should be treated. Contact Myriad to talk it through.


Latest news

Get in touch

Please contact us to discuss how working with Myriad can maximise and secure R&D funding opportunities for your business.

Contact us